Type Here to Get Search Results !

21st FEBRUARY 2024 ENGLISH TNPSC CURRENT AFFAIRS PDF TNPSC SHOUTERS


21st FEBRUARY 2024 ENGLISH TNPSC CURRENT AFFAIRS PDF TNPSC SHOUTERS

Japan to provide 232.209 billion Japanese Yen as Official Development Assistance Loan for nine projects in various sectors in India
  • The Government of Japan has committed 232.209 billion yen in official development assistance loans to nine projects in various sectors. Mr. Vikas Sheel, Additional Secretary, Department of Economic Affairs, Ministry of Finance, Government of India and Ambassador of Japan to India, Mr. The results were exchanged today between Suzuki Hiroshi.
  • Northeast Road Network Link Development Project (Phase 3) (Part II): Tubri-Phulbari Bridge (34.54 billion Japanese Yen)
  • Northeast Road Infrastructure Link Development Project (Phase 7: NH 127B (Phulbari-Korakre Section) (15.56 billion Japanese Yen)
  • A project to promote entrepreneurship and innovation in Telangana (23.7 billion Japanese yen)
  • Project for Construction of Chennai Ring Road (Phase 2) (49.85 Billion Japanese Yen)
  • Project for Promotion of Sustainable Horticulture in Haryana (16.21 Billion Japanese Yen)
  • Project for Climate Change Action and Ecosystem Services Development in Rajasthan (26.13 billion Japanese yen)
  • Project for establishment of Medical College Hospital at Nagaland Institute of Medical Sciences and Research, Kohima (10 billion Japanese Yen)
  • A project to improve urban water supply system in Uttarakhand (16.21 billion Japanese yen); and Dedicated Freight Rail Project (Phase 1) (40 billion Japanese Yen)
  • The road infrastructure connectivity projects aim to promote infrastructure development in the north-eastern region of India, while the Chennai Peripheral Ring Road project aims to ease traffic congestion and strengthen connectivity to the southern part of the state.
  • The project implemented in Nagaland will improve medical college hospital, improve tertiary care delivery and provide healthcare to all. A unique project in Telangana will focus on women and rural people to help discover entrepreneurial skills and support business expansion of MSMEs.
  • In Haryana, the project will promote sustainable horticulture and increase farmers' income by encouraging crop diversification and infrastructure development. The Forestry Project in Rajasthan will improve ecosystem services through afforestation, forest and biodiversity conservation. 
  • The project aims to provide sustainable water supply to urban towns in the hilly state of Uttarakhand. The fifth tranche of the Dedicated Freight Corridor Project will enable the construction of a new dedicated freight rail system and modernize the intermodal freight transport system to help handle increasing freight traffic.
  • India and Japan have a long and fruitful history of bilateral development cooperation since 1958. Economic partnership, a key pillar of India-Japan relations, has been progressing steadily over the past few years. The exchange of inputs for these key projects will further strengthen the strategic and global partnership between India and Japan.
Cryogenic engine test success
  • After the success of Chandrayaan-3 and Aditya L-1, the Indian Space Research Organization (ISRO) is focusing on the Kaganyan project next. The Gaganyaan project to send humans into space is being prepared. ISRO has chosen LVM-3 rocket for this purpose. 
  • This rocket is capable of carrying goods weighing about 8 tons. This rocket was also used in the Chandrayaan-3 project. ISRO has made some changes in this rocket for the Gaganyaan project.
  • It has been reported that the cryogenic engine that propels this rocket has been tested successfully. Propulsion and performance of the cryogenic engine have been successfully tested. In this regard, the published report says: CE20 cryogenic engine test was conducted on the 13th at the test center at ISRO Propulsion Complex in Mahendragiri, Tamil Nadu. 
  • In this the performance of the engine, maximum resistance, propulsion power etc. were tested. All these tests have been successful. This engine should run for at least 6350 seconds. But in testing, the 8810 performed better in different climates. This is reported.

Post a Comment

0 Comments
* Please Don't Spam Here. All the Comments are Reviewed by Admin.

Top Post Ad

Below Post Ad

Hollywood Movies

close

Join TNPSC SHOUTERS Telegram Channel

Join TNPSC SHOUTERS

Join Telegram Channel