Type Here to Get Search Results !

TNPSC 16th JULY 2022 CURRENT AFFAIRS TNPSC SHOUTERS ENGLISH PDF

 

Parasin Open Chess - Pragnananda Champion

  • In Serbia, the Parasin Open Chess Series was held. Pragnananda from Chennai, who came first with 8 points including 7 wins and 2 draws in the nine-round series, became the champion.
  • Alexander Bretke of Russia finished 2nd with 7.5 points. Kazakhstan's Alisher Suleymenov and India's Muthiah share the third spot with 7 points each.
  • Later, the Kazakhstan player won the 3rd position based on 'tie breaker score'. Muthiah got 4th position.
  • Earlier, Pragnananda beat fellow Indians Sreeja Seshatri, Lasesar Yordanov (Bulgaria), Kazibek Nogarbek (Kazakhstan), compatriots Koustav Chatterjee and Aristonbek Urasayev (Kazakhstan) in the series.
World Athletics Championships 2022
  • India's Avinash Sable has qualified directly for the finals of the 3000m steeplechase at the World Athletics Championships in Oregon after finishing third in 8min 18:75sec.
Paralympic World Cup - 2 golds and 1 silver for India
  • India has bagged 3 medals in shooting at the Paralympic World Cup held in Munich, Germany.
  • In the p3 25m pistol sh1 category, Rahul Jagar won gold and Singhraj Adhana won silver, while in the team category, Rahul, Singhraj, Nihal Singh won gold in the P3 25m pistol sh1 category.
World Athletics Championships
  • Kerala's Murali Sreesankar has qualified for the long jump final. Murali Sreesankar became the first athlete from India to reach the long jump final at the World Athletics Championships.
World Cup Shooting - Tomar wins gold
  • Reigning junior world champion Tomar (21 years, Madhya Pradesh) won the gold medal in the 50m rifle category final in South Korea with a resounding 16-12 win over Hungary's Zalon Begler.
  • It is worth noting that he had done a great job in the previous qualifying round and topped with 593 points.
Modi inaugurates UP 296 km expressway
  • National Highway No. Chitrakoot District, Uttar Pradesh State. Bundelkhand Expressway has been constructed to connect with Agra-Lucknow Expressway from 35 to Guthrail village in Etawah District.
  • Prime Minister Modi laid the foundation stone for this project in 2020. In this case, this road work has been completed in 28 months with a cost of Rs. 14 thousand 850 crores and a distance of 296 km. Modi opened this up.

Post a Comment

0 Comments
* Please Don't Spam Here. All the Comments are Reviewed by Admin.

Top Post Ad

Below Post Ad

Hollywood Movies

close

Join TNPSC SHOUTERS Telegram Channel

Join TNPSC SHOUTERS

Join Telegram Channel